Gallery

The work

The builds. Langley, BC. Roofs and shell work outside. Kitchens inside.

Riding

Arenas

The end wall painted, then the shell, then the wall while it was still open.

  • Arena shell in white metal under the red arch, lumber and machines in the yard
  • Metal siding on the arena, the upper floor still in house wrap, lift at the wall
  • Arena wall from the lift, metal below and house wrap around the windows
  • Metal roof tight to the arena wall, still in house wrap under the red arch
  • Arena end wall in OSB under the red arch, lift and lumber in the yard
  • Boom lift parked at the OSB arena wall, the arch still open
  • OSB on the arena end wall, lift and stacked lumber in front
  • Lift set against the OSB arena wall while the arch is still framed
  • Arena wall framed inside the arch, balcony and door openings in
  • Balcony framed into the arena wall under the arch
  • Second-floor balcony and window openings framed in the arena wall
  • Gable end of a riding arena with a wide door and a viewing loft
  • Arena end wall painted, the steel arch and the door above the footing
  • Indoor riding arena with a steel truss roof and fresh footing
  • Arena end wall in OSB, before the paint, under the steel arch